Home / ISO 22000 Lead Auditor / Grading nonconformities
Audit findings and grading
Major, minor or critical: how certification auditors grade food safety nonconformities
The course at a glance
- Provider ASC Food Safety Training, South Africa
- Price USD 999 (charged as R16 595)
- Study time about 44.5 hours, self-paced
- Format fully online, no live sessions
- Access 12 months from enrolment
- Audit criteria ISO 22000:2018 with Amd 1:2024
- Auditing ISO 19011:2026
- Certification rules ISO/IEC 17021-1:2015, ISO 22003-1:2022
- PRPs ISO 22002-100:2025, ISO 22002-1:2025
- Capstone 13-step virtual audit, about 13 hours, 70 of 100 to pass
- Exams A and B, online, webcam proctored, photo ID
- Pass rule 70% in every section, three attempts
The grade is the part of a finding the client remembers. A minor means a corrective action plan and a check at the next audit. A major means 28 days to close it or lose the certificate for a while. Under a scheme like FSSC 22000, a critical means the certificate is suspended within three working days. Auditors who grade by gut feel get challenged at the closing meeting and overturned at technical review. Auditors who grade from the definitions rarely do.
What does ISO/IEC 17021-1 say about major and minor nonconformities?
ISO/IEC 17021-1:2015 is the standard certification bodies are accredited against, and it defines three terms you need.
- Nonconformity (3.11): non-fulfilment of a requirement.
- Major nonconformity (3.12): a nonconformity that affects the capability of the management system to achieve the intended results.
- Minor nonconformity (3.13): a nonconformity that does not affect that capability.
The note to 3.12 does most of the practical work. A nonconformity could be classified as major if there is significant doubt that effective process control is in place, or that products will meet specified requirements. And a number of minor nonconformities against the same requirement or issue could show a systemic failure, which then makes them a major.
That is all. The standard has no critical grade. So when someone tells you “ISO says critical”, they are quoting a scheme.
Where does the critical grade come from?
From certification scheme owners, who add a grade above major for situations where waiting 28 days is not acceptable. FSSC 22000 is the clearest example because its rules are published in full in Part 3 of the scheme. Version 6 and version 7 use the same three grades.
In FSSC 22000, a critical nonconformity is issued when there is a significant failure in the management system, a situation with direct adverse food safety impact and no appropriate action is observed, or when food safety legality or certification integrity is at stake. Other GFSI benchmarked schemes have their own top grades and their own rules, so read the current issue of the scheme you are auditing against.
What happens after each grade under FSSC 22000?
The table follows the version 7 text. The version 6 text sets the same 28-day, three-working-day, six-week and six-month clocks.
| Grade | When it is issued | What follows |
|---|---|---|
| Minor | The finding does not affect the capability of the management system to achieve the intended results | The organisation sends evidence of correction, the root cause investigation, exposed risks and a corrective action plan. The certification body approves it within 28 calendar days of the last audit day, or the certificate is suspended. Effectiveness is checked at the next audit at the latest. |
| Major | The finding affects that capability, or there is a legislative noncompliance linked to quality | Closed by the certification body within 28 calendar days of the last audit day, usually through an on-site follow-up, sometimes a desk review. If it cannot be closed in time, the certificate is suspended. A major at Stage 2 not closed in 28 days means the full Stage 2 is repeated. |
| Critical | Significant failure of the system, direct adverse food safety impact with no appropriate action, or food safety legality or certification integrity at stake | Certificate suspended within 3 working days, for up to six months. A separate full on-site audit, of at least one day, between six weeks and six months later. Not resolved within six months: certificate withdrawn. At an initial certification audit, the audit is failed and repeated. |
Version 7 also sets 14 calendar days for the organisation to send its root cause investigation and corrective action plan after a critical, and it states plainly that the scheme does not allow opportunities for improvement. Audits against version 6 can be delivered until 30 April 2027. Upgrade audits against version 7 run from 1 May 2027 to 30 April 2028.
Practise grading until it is automatic
Module 7 of the ISO 22000:2018 Lead Auditor course teaches grading major and minor under ISO/IEC 17021-1, systemic patterns and the scheme critical grade. Then you grade real-looking evidence in the virtual audit and in Exam B.
How do you decide the grade? A four-question path
- Is it a nonconformity at all? Name the requirement, state the evidence and show the gap. If you cannot write all three, you do not have a finding yet. Go and get more evidence or let it go.
- Does it affect the system’s capability to achieve its intended results? Ask whether there is significant doubt that the process is under control or that the product will meet requirements. If yes, it is major. If no, it is minor.
- Is it one of several? Look across the team’s notes before the closing meeting. Three minors against the same requirement in three departments may be one systemic major.
- Under a scheme, does it meet the critical definition? Direct adverse food safety impact with no appropriate action, a food safety legal breach, or something that threatens the integrity of certification itself, such as falsified records.
Then write the finding to the most relevant requirement. FSSC 22000 requires nonconformities to be written against the most relevant scheme requirement, whether that is ISO 22000:2018, the PRP standard or an FSSC additional requirement.
Worked examples: how the grade changes with the evidence
These are teaching examples, invented for this post, at sites of different kinds.
| What the auditor finds | Likely grade | Why |
|---|---|---|
| Bakery. One cleaning record for a mixer is unsigned. The cleaning schedule, the verification swab results and an interview with the cleaner all show the clean was done. | Minor | A requirement for records was not met, but the evidence shows the control works. No doubt about the product. |
| Snack factory. Metal detector checks were not recorded on any shift for six days, and nobody can show the checks were done. | Major | Significant doubt that a control measure was in place for six days of production. |
| Frozen vegetable plant. Allergen changeover records are missing in packing, dispatch and the pilot line. | Major | Separately they might be minors. Together they show the allergen changeover process is not working. |
| Ready-to-eat salad plant. A food contact surface tested positive for Listeria monocytogenes two weeks ago. Product from that line was released, and there is no investigation or extra sampling. | Critical (scheme) | Direct adverse food safety impact and no appropriate action observed. |
| Meat plant. CCP temperature records for a day the auditor knows the line was down are filled in and signed. | Critical (scheme) | The records are false, so certification integrity is at stake. |
What moved the grade each time was whether the auditor could see the control working and whether the site had acted.
Where do auditors go wrong when grading?
Grading the person, not the evidence
A rude production manager does not turn a minor into a major. A charming one does not turn a major into a minor. The definition is about the system’s capability.
Negotiating in the closing meeting
The site can challenge the evidence, and you should listen. If they show you something new and reliable, review it. If they only dislike the grade, the grade stands, and the appeal route is there for them.
Hiding a nonconformity as an observation
Under FSSC 22000 version 7 there are no opportunities for improvement to hide it in. In any audit, an opportunity for improvement should never be a disguised finding, and it should not cross into advice on how to fix things, which would put the auditor’s impartiality at risk.
Forgetting the follow-through
FSSC 22000 version 7 notes that failing to address a minor from the previous audit could lead to a major at the next one. Check the last report before you arrive.
For the writing side of a finding, read our post on how to write a food safety audit finding that gets fixed. For the hazard control evidence behind many majors and criticals, see ISO 22000 clause 8.5 explained.
Where does the course teach grading?
Lesson 7.7 covers grading major and minor, systemic patterns and opportunities for improvement, with the scheme critical grade set beside the ISO/IEC 17021-1 grades. You practise with a finding writer and grader tool, then grade findings at the team review stage of the virtual audit of Abita Dairy, which carries 14 of the 100 marks. Exam B has a section marked by an examiner on writing and grading findings, and another on evaluating a corrective action response. Lesson 8.3 then teaches you to judge whether a correction, a root cause and a corrective action are good enough to close a finding.
Learn to grade like a certification auditor
About 44.5 hours online, a 13-step virtual audit marked by a named examiner, and webcam proctored exams. USD 999 with 12 months of access.
Frequently asked questions
What is the difference between a major and a minor nonconformity?
Under ISO/IEC 17021-1:2015, a major nonconformity affects the capability of the management system to achieve its intended results, and a minor nonconformity does not. Significant doubt about process control or product conformity points to a major.
Can several minor nonconformities become a major?
Yes. The note to ISO/IEC 17021-1 definition 3.12 says a number of minor nonconformities associated with the same requirement or issue could demonstrate a systemic failure and so constitute a major nonconformity.
Does ISO 22000 have a critical nonconformity?
No. ISO 22000 certification uses the ISO/IEC 17021-1 grades of major and minor. Critical is added by certification schemes such as FSSC 22000, which publish their own definition and consequences.
What is a critical nonconformity in FSSC 22000?
A significant failure in the management system, a situation with direct adverse food safety impact where no appropriate action is observed, or a case where food safety legality or certification integrity is at stake. The certificate is suspended within three working days for up to six months.
How long do you have to close a major nonconformity under FSSC 22000?
The certification body must close it within 28 calendar days of the last day of the audit, usually after an on-site follow-up. If it cannot be closed in that time, the certificate is suspended. At Stage 2, failure to close in 28 days means the full Stage 2 audit is repeated.
What happens to a minor nonconformity under FSSC 22000?
The organisation sends evidence of correction, its root cause investigation and a corrective action plan, which the certification body must approve within 28 calendar days of the last audit day. Effectiveness is checked at the next audit at the latest.
What happens after a critical nonconformity at FSSC 22000?
The certificate is suspended within three working days. A separate full on-site audit of at least one day takes place between six weeks and six months later. If the critical is not resolved within six months the certificate is withdrawn, and at an initial certification audit the audit is failed and repeated.
Does FSSC 22000 version 7 change the grading rules?
Version 7 keeps minor, major and critical with the same core consequences as version 6. It sets 14 calendar days for the plan after a critical and does not allow opportunities for improvement. Audits against version 6 may be delivered until 30 April 2027.
Buy the lead auditor course, USD 999Read the course outlineFully online and self-paced. Certificate of Achievement for each unit you pass.
Sources
- IAS reproduction of ISO/IEC 17021-1:2015 section 3, definitions 3.12 and 3.13
- Foundation FSSC, FSSC 22000 Scheme Version 6.0 (copy hosted by BSI), Part 3 sections 5.4 and 6.2
- Foundation FSSC, FSSC 22000 Scheme Version 7.0, May 2026 (Part 2 clause 2.5.18.2, Part 3 section 6.2, Part 4 section 3.5)
- Foundation FSSC, Version 7 Upgrade Process requirements, 1 May 2026
- ASC Food Safety Training, ISO 22000:2018 Lead Auditor (Food Safety Management Systems), course page
